MAUP PLASTIC FORMWORK · ENGINEERED IN CHINA

Reusable Plastic Formwork, Engineered Around Your Project.

Complete ABS and PP formwork systems for walls, columns, slabs, foundations, pools and water-retaining structures—from drawing review and quantity calculation to delivery and site support.

60 kN/m²Wall pressure capacity
80 kN/m²Column and slab applications
100+Potential reuse cycles*
8.7 kg1200 × 600 mm panel
Two systems. One engineering approach.

Select the right system for the concrete structure—not simply the lowest panel price.

MAUP combines modular panels, connecting hardware and reinforcement accessories into a project-specific working system.

65 mm Lightweight System

Optimized for residential buildings, standard walls, columns and repetitive low- to mid-rise construction.

Lightweight handlingFast assemblyFlexible panel sizes

View 65 mm System →

78 mm Heavy-Duty System

Higher-rigidity configuration for thicker walls, demanding pours, infrastructure and special engineering conditions.

Heavy-duty ribsComplex structuresEngineering support

View 78 mm System →

Applications

A focused product range covering the structures contractors build most.

01

Wall Formwork

Modular wall layouts with tie rods, Q700 steel walers and push-pull props.

02

Column Formwork

Adjustable square columns and fixed-diameter round column systems.

03

Slab Formwork

Panel, prop and support configurations for repetitive floor construction.

04

Foundation Formwork

Reusable solutions for strip foundations, pile caps and grade beams.

05

Pool & Water Tank

Corrosion-resistant panels for pools and water-retaining concrete structures.

06

Basement & Retaining Wall

Reinforced layouts for thick walls, restricted access and single-sided conditions.

Project engineering

From drawings to a buildable formwork package.

We calculate panel quantities, plan special areas, configure accessories and prepare the supply list around the pour sequence.

STEP 01

Drawing Review

Wall, column, slab, opening and pour-condition review.

STEP 02

System Selection

65 mm or 78 mm based on height, thickness and pressure.

STEP 03

Layout & Quantity

Panel arrangement, accessories and reinforcement calculation.

STEP 04

Delivery Support

Packing, installation guidance and technical follow-up.

Built for repeated use

Lower handling effort. Faster cycles. More flexibility between projects.

Lightweight modular panels can be handled without cranes, assembled with quick-lock handles and adapted to different structures using standard panels and timber-formwork adaptors.

Explore MAUP Projects →

3,000 m²Approximate daily production capacity


10–15 daysTypical production lead time

Have a concrete project?

Send PDF, CAD or project dimensions for a tailored layout and quotation.

Send Drawings & Get a Proposal